logo
ProjectComplete

Black Sea - Midia Gas Development Project

The status, timeline and source of this project. A free account opens every field.

Source: European Bank for Reconstruction and Development (EBRD)

The Midia Gas Development Project (MGD Project) comprises the Ana and Doina gas fields located some 120 km offshore Romania in the XV Midia Shallow area. MGD Project consists of 5 production wells (1 subsea well at Doina field and 4 platform wells at Ana field) a subsea gas production system over the Doina well which will be connected through an 18 km pipeline with a new unmanned production platfo

Status
Closed
Sector
Natural Gas, Oil and Gas, Seaport, Government, Raw Materials, Commercial, Road, Residential
Location
Romania
Updated
22 Jul 2026
Source
European Bank for Reconstruction and Development (EBRD)

ConstructChat

Ask ConstructChat about Black Sea - Midia Gas Development Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Black Sea - Midia Gas Development Project” is an infrastructure initiative in the Natural Gas sector, located in Romania. Taiyo aggregates data on it from European Bank for Reconstruction and Development (EBRD).

Participants

Not available for this record.

Status

Original status

complete

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Midia Gas Development Project (MGD Project) comprises the Ana and Doina gas fields located some 120 km offshore Romania in the XV Midia Shallow area. MGD Project consists of 5 production wells (1 subsea well at Doina field and 4 platform wells at Ana field) a subsea gas production system over the Doina well which will be connected through an 18 km pipeline with a new unmanned production platform located over Ana field. A 121 km subsea pipeline will ensure the delivery of the gas from Ana platform to the shore, where a 4.1 km underground pipeline will connect to the new gas treatment plant. Additional information can be found on the Black Sea Oil & Gas website. Full ESIA documentation is available locally at: Black Sea Oil & Gas SRL 175 Calea Floreasca, 10th floor, district #1, 014459, Bucharest, Romania, phone +40 21 231 32 56 e-mail: office@blackseaog.com And European Bank for Reconstruction and Development District 1, 89-97 Grigore Alexandrescu Street, Metropolis Centre, West Wing, 3rd Floor Bucharest Iustin Ivanescu Phone:0040 21 202 71 00 And RO EN Environmental or social enquiries Ms. Ana-Maria Pericleanu Telephone: +40 21 231 32 56 E-mail: ana-maria.pericleanu@blackseaog.com or office@blackseaog.com

Original sector

Natural Resources

Budget

Location

Country

Romania

Source

Source

European Bank for Reconstruction and Development (EBRD)

URL

More Details

Record type

Project

Sector

Natural Gas, Oil and Gas, Seaport, Government, Raw Materials, Commercial, Road, Residential

Article published date

2026-06-08

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project