Black Sea Submarine Power Cable Project
Sector: Power Generation (CCGT) • Location: Georgia, Romania, Azerbaijan, Hungary
Source: Report.az
The Black Sea submarine cable project is a major infrastructure project that will directly connect Georgia and Romania and link the power systems of the South Caucasus and Southeastern Europe. The submarine cable will be 1,115 km long (underwater and 40 km overland), with a voltage of 525 kV and a capacity of 1,300 MW. Completion is scheduled for 2032.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | planned |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Black Sea submarine cable project is a major infrastructure project that will directly connect Georgia and Romania and link the power systems of the South Caucasus and Southeastern Europe. The submarine cable will be 1,115 km long (underwater and 40 km overland), with a voltage of 525 kV and a capacity of 1,300 MW. Completion is scheduled for 2032. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
