Blackbridge Road Transfer Station Construction
One of 10,000+ projects Taiyo tracks in Pennsylvania.
Source: Dodge
The work includes the furnishing of all labor, materials and equipment necessary to complete the work as shown on the Drawings and as described in the Specifications. The building is designed and constructed for the purposes of receiving, off-loading and handling solid waste product. The building is a pre-engineered metal building structure with a concrete slab on grade suitable for heavy truck tr
- Status
- Prospective
- Sector
- Metal, Cement, Biomass, Commercial, Waste Processing and Treatment, Road, Automotive, Government
- Location
- York, Pennsylvania, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Blackbridge Road Transfer Station Construction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | gc bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work includes the furnishing of all labor, materials and equipment necessary to complete the work as shown on the Drawings and as described in the Specifications. The building is designed and constructed for the purposes of receiving, off-loading and handling solid waste product. The building is a pre-engineered metal building structure with a concrete slab on grade suitable for heavy truck traffic, with a drive-through vehicle aisle, with overhead doors at each end; a seven [7] bay off-l... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Pennsylvania |
City | York |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Metal, Cement, Biomass, Commercial, Waste Processing and Treatment, Road, Automotive, Government |
Article published date | 2025-09-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- NEW 3200 SF PREFAB METAL BUILDING CONSISTING OF A CUSTOMER INTERFACE, OFFICES, RESTROOM/BREAK ROOM, DISASSEMBLY & STOR.
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- REPLACE DAMAGED STEEL COLUMN
