logo
ProjectStart

Blackhawk Middle School Building Phase 2e

One of 10,000+ projects Taiyo tracks in Indiana.

Source: Dodge USA

Weigand Construction Co., Inc. Blackhawk Middle School-phase 2e Rooms B103,203 & B105 Lula Lift. Cdr 440339 Remodel Of 150sf For Lula Lift That Travesl From Level 1 To Level 2 Between Rooms B103 And B203. Along With The Machine Control Room Located On Level 1 In Room B105. No Demo Of Walls Or Installation Of New Wall. Demo Scope To Include Concrete Slab At Sog And Sod To Install Shaft. New Install

Status
Prospective
Sector
Commercial, Power Generation (CCGT), Education, Government, Cement
Location
Fort Wayne, Indiana, United States of America
Updated
19 Nov 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Blackhawk Middle School Building Phase 2e

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Blackhawk Middle School Building Phase 2e” is an infrastructure initiative in the Commercial sector, located in Fort Wayne, Indiana, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Start

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

Weigand Construction Co., Inc. Blackhawk Middle School-phase 2e Rooms B103,203 & B105 Lula Lift. Cdr 440339 Remodel Of 150sf For Lula Lift That Travesl From Level 1 To Level 2 Between Rooms B103 And B203. Along With The Machine Control Room Located On Level 1 In Room B105. No Demo Of Walls Or Installation Of New Wall. Demo Scope To Include Concrete Slab At Sog And Sod To Install Shaft. New Install To Include Concrete Footers For Masonry Shaft, Masonry Shaft For The Lift, Inwall Electrical Pat...

Budget

Location

Country

United States of America (USA)

State

Indiana

City

Fort Wayne

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Commercial, Power Generation (CCGT), Education, Government, Cement

Article published date

2025-01-06

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project