Blackhawk Middle School Phase 4C
Sector: Power Generation (CCGT) • Location: Fort Wayne, Indiana, United States of America
Source: Dodge USA
Blackhawk Middle School Weigand Construction Phase 4C: Level 1; Room B190 Sdr #440339. No New Walls, No Demo Of Walls. Remodel Of 661Sf On Level 1 Of Blackhawk Middle School. Remodel Work Is To Take Place In The South Part Of Circulation B190. Demo Scope To Include Minor Mechanical, Electrical, And Plumbing. New Install To Include Mechanical. Ceilings Will Remain Out In Corridor Until A Later Phas
- Status
- Prospective
- Sector
- Power Generation (CCGT), Commercial, Government, Education
- Location
- Fort Wayne, Indiana, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Blackhawk Middle School Phase 4C
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Start |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Blackhawk Middle School Weigand Construction Phase 4C: Level 1; Room B190 Sdr #440339. No New Walls, No Demo Of Walls. Remodel Of 661Sf On Level 1 Of Blackhawk Middle School. Remodel Work Is To Take Place In The South Part Of Circulation B190. Demo Scope To Include Minor Mechanical, Electrical, And Plumbing. New Install To Include Mechanical. Ceilings Will Remain Out In Corridor Until A Later Phase. Number Of Stories Above Grade: 1 |
Budget |
Location
Country | United States of America (USA) |
State | Indiana |
City | Fort Wayne |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Commercial, Government, Education |
Article published date | 2024-12-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 77 @ FALLING CREEK 6.1 MI S OF ELBERTON
- VALDOSTA - AIRFIELD ELECTRICAL IMPROVEMENTS
- CR 423/MOUNT OLIVE ROAD @ SANDY CREEK NW OF DUBLIN
- DISTWIDE STUDY REMOVAL/RELOCATION OF UTILITY POLES DIST 3
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
