Blacks Creek Energy Solar Center 400 MW
Sector: Energy Storage • Location: Idaho, United States of America
Source: Dodge USA
Project consists of a 400- megawatt (MW) solar photovoltaic (PV) generation facility, a 200-MW battery energy storage system (BESS), and ancillary facilities on 4,323 acres approximately 3.75 miles southeast of the Boise Airport. The facility will include arrays of ground-mounted solar PV panels, single-axis solar tracking structures, battery energy storage system, related electrical equipment (in
- Status
- Prospective
- Sector
- Energy Storage, Airport, Power Generation (CCGT), Solar, Commercial
- Location
- Idaho, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Blacks Creek Energy Solar Center 400 MW
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Design Development |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Project consists of a 400- megawatt (MW) solar photovoltaic (PV) generation facility, a 200-MW battery energy storage system (BESS), and ancillary facilities on 4,323 acres approximately 3.75 miles southeast of the Boise Airport. The facility will include arrays of ground-mounted solar PV panels, single-axis solar tracking structures, battery energy storage system, related electrical equipment (including transformers, inverters, and racking), an on-site substation, and a new 230-kilovolt (kV)... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Idaho |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Energy Storage, Airport, Power Generation (CCGT), Solar, Commercial |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Energy Storage projects in United States of America
- INSTALL ROOF MOUNTED SOLAR PV SYSTEM 9.6 KW 24 MODULES AND 13.5 KWH ENERGY STORAGE SYSTEM N 225A LOAD CENTER
- ROOFTOP SOLAR PV INSTALL. (8) 400W MODULES AT 3.2 KW TOTAL. INSTALL (1) (N) ESS TELSA POWERWALL BATTERY AT 13.5 KWH.
- INSTALL ROOF MOUNTED SOLAR PV SYSTEM 7.02 KW 18 MODULES AND 1 CHEM BATTERY AT 9.8KWH
- INSTALL ROOF MOUNTED SOLAR PV SYSTEM 3.78 KW 13.5KH ENERGY STORAGE SYSTEM
- INSTALL (16) TILTED 355W MODULES AT 5.68 KW TOTAL. INSTALL ( 1) TESLA POWERWALL BATTERY AT 13.5 KWH.
- INSTALL TESLA SOLAR ROOF 13.92 KW 27 KWH ENERGY STORAGE SYSTEM NEW 225A DISTRIBUTION PANEL
- ROOFTOP PV SOLAR PANEL INSTALL (21) 400W MODULES AT 8.4 KW T OTAL. INSTALL (1) LG CHEM BATTERY AT 9.88 KWH CAPACITY
- ROOFTOP SOLAR PANEL INSTALL: (10) 400W MODULES AT 4.0 KW TOT AL. INSTALL (1) LG CHEM BATTERY AT 9.8 KWH CAPACITY.
