logo
ProjectDelayed

Blackwater Solar Tranche 3 - BESS

Delayed · Virginia · Last reported Mar 2025

Source: Dodge

600 MW solar farm and 400 MW battery storage on 4,800 acres.

Status
Failure
Sector
Energy Storage, Power Generation (CCGT), Solar, Raw Materials, Commercial
Location
Waverly, Virginia, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Blackwater Solar Tranche 3 - BESS

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Blackwater Solar Tranche 3 - BESS” is an infrastructure initiative in the Energy Storage sector, located in Waverly, Virginia, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

Delayed

Taiyo status

Failure

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

600 MW solar farm and 400 MW battery storage on 4,800 acres.

Budget

Location

Country

United States of America (USA)

State

Virginia

City

Waverly

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Energy Storage, Power Generation (CCGT), Solar, Raw Materials, Commercial

Article published date

2025-03-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project