Blair County - Salt Storage Building Construction
One of 10,000+ projects Taiyo tracks in Pennsylvania.
Source: Dodge
Work covers the construction of a salt storage building and associated site improvements at the Blair County Maintenance Facility in the Borough of Hollidaysburg, Blair County. The work will be performed under TWO prime contracts 1) General and 2) Electrical. 1.02 SUMMARY OF WORK A. Work shall include but not be limited to the following: 1. Contract 1 Mobilization, demolition, excavation, backfill
- Status
- Closed
- Sector
- Power Generation (CCGT), Road, Warehouse, Raw Materials, Consumer Products, Government, Commercial
- Location
- Hollidaysburg, Pennsylvania, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Blair County - Salt Storage Building Construction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Work covers the construction of a salt storage building and associated site improvements at the Blair County Maintenance Facility in the Borough of Hollidaysburg, Blair County. The work will be performed under TWO prime contracts 1) General and 2) Electrical. 1.02 SUMMARY OF WORK A. Work shall include but not be limited to the following: 1. Contract 1 Mobilization, demolition, excavation, backfill, erosion control, macadam pavement, construction of salt storage building, trench and backfill f... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Pennsylvania |
City | Hollidaysburg |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Road, Warehouse, Raw Materials, Consumer Products, Government, Commercial |
Article published date | 2025-03-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 77 @ FALLING CREEK 6.1 MI S OF ELBERTON
- VALDOSTA - AIRFIELD ELECTRICAL IMPROVEMENTS
- CR 423/MOUNT OLIVE ROAD @ SANDY CREEK NW OF DUBLIN
- DISTWIDE STUDY REMOVAL/RELOCATION OF UTILITY POLES DIST 3
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
