Blair Road Retaining Wall Replacement Project
Sector: Road • Location: Ohio, United States
Source: News-Herald
Replacement of approximately 400 feet of retaining wall on Blair Road in Leroy and Perry townships, including reconstructing the adjacent roadway, installing guardrails, storm drainage, and related tasks. The project has been delayed beyond the planned fall 2025 completion due to differing site conditions and will remain closed during winter until spring 2026 for weather-sensitive work.
- Status
- Failure
- Sector
- Road, Commercial, Residential, Waste Processing and Treatment, Government
- Location
- Ohio, United States of America
- Updated
- 22 Jul 2026
- Source
- News-Herald
ConstructChat
Ask ConstructChat about Blair Road Retaining Wall Replacement Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | delayed |
Taiyo status | Failure |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Replacement of approximately 400 feet of retaining wall on Blair Road in Leroy and Perry townships, including reconstructing the adjacent roadway, installing guardrails, storm drainage, and related tasks. The project has been delayed beyond the planned fall 2025 completion due to differing site conditions and will remain closed during winter until spring 2026 for weather-sensitive work. |
Original sector | Transportation |
Budget |
Location
Country | United States of America (USA) |
State | Ohio |
Source
Source | News-Herald |
URL |
More Details
Record type | Project |
Sector | Road, Commercial, Residential, Waste Processing and Treatment, Government |
Article published date | 2025-11-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
