Blaise Diagne International Airport

Sector: Government • Location: Senegal

Source: World Bank Group

Project
Active

In December 2006, Fraport signed a 25-year management contract with the Senegalese government (GoS) for the operation and maintenance of the Blaise Diagne Airport (AIBD), Dakar’s second airport scheduled for opening in 2009-2010. As of December 2007, information on the tender process were not known.

Fraport was neither involved in the construction nor in the financing process. Construction began

Project Information FAQ

Project Information

5 Q
The project “Blaise Diagne International Airport” is an infrastructure initiative in the Government sector, located in Senegal. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

In December 2006, Fraport signed a 25-year management contract with the Senegalese government (GoS) for the operation and maintenance of the Blaise Diagne Airport (AIBD), Dakar’s second airport scheduled for opening in 2009-2010. As of December 2007, information on the tender process were not known. Fraport was neither involved in the construction nor in the financing process. Construction began in April 2007 and was carried out by Saudi Binladen Group. Financing was provided directly by banks and through departure taxes. The management contract of Fraport was expected to start in 2008-2009, some months before the opening of the airport. Under the terms of the contract, Fraport was in charge of managing the entire airport operation (airside and landside), such as terminal management, retailing, facility and airside management, real estate development and passenger handling. In 2007, Dakar’s old airport had a capacity of around 1.5 million passengers per year. Capacity was expected to reach 5 million passengers per year after completion of the Blaise Diagne International Airport. [In 2011, a group of several banks agreed to financing amounting to $564 million (406 million euro), with funds due to come from the African Development Bank, the French Development Agency, the West-African Development Bank, and other banks from South Africa, Canada and Saudi Arabia. They loaned the money directly to the government. In 2012, the AfDB estimated that the total project cost were to amount to $730 million (575 million euro) to be financed by loans, $22 million (17 million euro) to be financed by the GoS (small costs and relocation costs for the affected population), and $54 million (42 million euro) financed under the BOT-contract. The AfDB was to support the project with a loan of $100 million (70 million euro) with a maturity of 18 months. The loan was approved on December 15, 2010, the first tier was paid out on 16 February 2012. The AfDB was also the co-arranger for loans from other banks and conventional lenders, including the French Development Agency AFD, the West-African Development Bank; the Islamic Development Bank brought on board a further three Islamic lenders.] Construction was nearing 50% completion by September 2012. Opening was foreseen for 2014. The operator company Daport S.A. was for 60% owned by Fraport. Daport was to be in charge of the management, operation and maintenance of the apron and terminal area as soon as the airport was in operation. To be recorded in the update when the airport would have been built. As of Dec. 2012: 50% completed. Very limited information on the bidding process. It has been reported by Fraport that it was a competitive bidding. http://cordiantcap.com/icf_debpt/aeroport-international-blaise-diagne/ Construction and management are separated. THIS IS NOT A BOT. AFDB financing should not be recorded since it is for the construction contract. Besides AfDB with €70 million, the Islamic Development Bank, l’Agence Francaise du Développement and the Saudi Fund are major participants with commitments of €100, €70 and USD100 million respectively. Another €26 million was committed by the West African Development Bank (BOAD). http://cordiantcap.com/icf_debpt/aeroport-international-blaise-diagne/

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data