Blakes Branch Sewer Separation, Ph8, Division 3
Sector: Water Supply and Storage • Location: Ottumwa, Iowa, United States of America
Source: Dodge USA
Construct Blake s Branch Sewer Separation, Phase 8, Division 3, including all labor, materials, and equipment necessary for approximately 25,500 square yards of portland cement concrete pavement, 1,500 square yards of portland cement concrete driveways, 4,500 square yards of portland cement concrete sidewalk, 1,500 square yards of bituminous seal coat, 8,500 linear feet of 15-inch through 36-inch
- Status
- Closed
- Sector
- Water Supply and Storage, Cement, Government, Commercial, Car parking, Waste Processing and Treatment, Road, Automotive
- Location
- Ottumwa, Iowa, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Blakes Branch Sewer Separation, Ph8, Division 3
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Construction Documents |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Construct Blake s Branch Sewer Separation, Phase 8, Division 3, including all labor, materials, and equipment necessary for approximately 25,500 square yards of portland cement concrete pavement, 1,500 square yards of portland cement concrete driveways, 4,500 square yards of portland cement concrete sidewalk, 1,500 square yards of bituminous seal coat, 8,500 linear feet of 15-inch through 36-inch reinforced concrete pipe storm sewer, 2,300 linear feet of 36-inch sanitary sewer pipe, 3,500 lin... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Iowa |
City | Ottumwa |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Government, Commercial, Car parking, Waste Processing and Treatment, Road, Automotive |
Article published date | 2024-11-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
