logo

Blanding Boulevard (State Road 21) Intersection Improvements from South of Wells Road to the Ortega River

Sector: Road • Location: Orange Park, Florida, United States of America

Source: Florida Department of Transportation (FDOT)

Project
Active

This project includes milling and resurfacing, base work, shoulder treatment, drainage improvements, curb and gutters, traffic signals, lighting, highway signing, bridges, sidewalks/bicycle path and other incidental construction on Blanding Boulevard (State Road 21) from south of Wells Road to the Ortega River. Traffic will be maintained in accordance with FDOT design standards throughout the dura

Project Information FAQ

Project Information

5 Q
The project “Blanding Boulevard (State Road 21) Intersection Improvements from South of Wells Road to the Ortega River” is an infrastructure initiative in the Road sector, located in Orange Park, Florida, United States of America. Taiyo aggregates data on it from Florida Department of Transportation (FDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

This project includes milling and resurfacing, base work, shoulder treatment, drainage improvements, curb and gutters, traffic signals, lighting, highway signing, bridges, sidewalks/bicycle path and other incidental construction on Blanding Boulevard (State Road 21) from south of Wells Road to the Ortega River. Traffic will be maintained in accordance with FDOT design standards throughout the duration of the project. No single lane closures on Blanding Boulevard and Wells Road will be allowed from 6 a.m. to 8 p.m. No double lane closures on Blanding Boulevard and Wells Road will be allowed from 5 a.m. to 10 p.m. J.B. Coxwell Contracting, Inc. was awarded the $8 million project. See the video

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data