logo

BLCP Power Plant

Sector: Manufacturing (Industrial) • Location: Thailand

Source: World Bank Group

Project
Active

At time of signing on 14 August 2003, the US$1.05 billion 15.75 year BLCP Power project, sponsored 50/50 by Banpu and CLP Power, was the biggest non-recourse debt deal for a greenfield independent power plant (IPP) in Asia since 1997. It was also Thailand’s biggest project financing in three years. In December 2006, Electricity Generating Public Company Limited (EGCO)acquired CLP's share in BLCP P

Project Information FAQ

Project Information

4 Q
The project “BLCP Power Plant” is an infrastructure initiative in the Manufacturing (Industrial) sector, located in Thailand. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

At time of signing on 14 August 2003, the US$1.05 billion 15.75 year BLCP Power project, sponsored 50/50 by Banpu and CLP Power, was the biggest non-recourse debt deal for a greenfield independent power plant (IPP) in Asia since 1997. It was also Thailand’s biggest project financing in three years. In December 2006, Electricity Generating Public Company Limited (EGCO)acquired CLP's share in BLCP Power Company Limited. The total generation capacity of BLCP was planned to be 1,434 MW split in two units. The plants were to be located in the Map Ta Phut Industrial Estate in Rayong Province, 200 km South of Bangkok. All of the power generated by the plant was to be sold to the state-owned Electricity Generating Authority of Thailand (EGAT) through a 25-year power purchase agreement (PPA). The PPA was awarded in December 1997 and included an average power sales tariff of Bt 1.589/kWh (then US$5.36/KWh). The coal supply agreement was signed with Australian Coal Holdings which is 100% owned by Rio Tinto. The first unit started commercial operations in December 2006 and the second one was expected to do so in February 2007. A Japanese consortium comprising Mitsubishi Heavy Industries and the Mitsubishi Corporation was awarded the engineering, procurement and construction (EPC) contract. Total project costs on BLCP were US$1.45 billion at a debt to equity ratio of 76:24. Participants in the US$1.1 billion equivalent local denominated debt led by Bangkok Bank and Krung Thai Bank included Siam Commercial Bank, Bank of Ayudhya, Siam City Bank, Thai Military Bank and Industrial Finance Corporation of Thailand. The third stage of the deal closed on 12 November 2003 with ADB providing a direct loan of US$40 million, followed by the closing on 4 February 2004 of a complementary financing scheme loan of up to US$100 million and US$70 million in PRI.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data