Bledsoe Creek State Park WW Infrastructure Replacement
Closed · Tennessee · Last reported Jul 2025
Source: Dodge
SBC Project No. 126/012-01-2023: Bledsoe Creek State Park Wastewater Infrastructure Replacement Design services for the replacement of the existing recirculating sand filter wastewater treatment plant and construct septic fields to discharge effluent with capacity of approximately 0.012 million gallons per day at Bledsoe Creek State Park.
- Status
- Closed
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Car parking, Automotive, Commercial
- Location
- Gallatin, Tennessee, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Bledsoe Creek State Park WW Infrastructure Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | SBC Project No. 126/012-01-2023: Bledsoe Creek State Park Wastewater Infrastructure Replacement Design services for the replacement of the existing recirculating sand filter wastewater treatment plant and construct septic fields to discharge effluent with capacity of approximately 0.012 million gallons per day at Bledsoe Creek State Park. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Tennessee |
City | Gallatin |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Car parking, Automotive, Commercial |
Article published date | 2025-07-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
