Bălți-Suceava Overhead Power Line
The status, timeline and source of this project. A free account opens every field.
Source: Guvernul Republicii Moldova
The project involves the construction of a 400 kV overhead power transmission line connecting Bălți in Moldova to Suceava in Romania, along with the reconstruction of the Balti electrical substation and rehabilitation of segments of the power networks.
- Status
- Prospective
- Sector
- Power Generation (CCGT), Government
- Location
- Moldova
- Updated
- 22 Jul 2026
- Source
- Guvernul Republicii Moldova
ConstructChat
Ask ConstructChat about Bălți-Suceava Overhead Power Line
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project involves the construction of a 400 kV overhead power transmission line connecting Bălți in Moldova to Suceava in Romania, along with the reconstruction of the Balti electrical substation and rehabilitation of segments of the power networks. |
Original sector | Energy |
Budget |
Location
Country | Moldova |
Source
Source | Guvernul Republicii Moldova |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Government |
Article published date | 2025-03-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in Moldova
- Union Fenosa Moldova
- RED Union Fenosa S.A.
- Red Chisinau, S.A.; Red Centru, S.A.; and Red Sud, S.A.
- Feasibility Study on Synchronous Interconnection of Ukrainean and Molodvan Power Systems to ENTSO-E Continental European Power System
- Improving the cross-border public transportation using electric buses supplied with renewable energy
- MOLDELECTRICA POWER TRANSMISSION
- Moldova Romania Power Interconnection Phase I
- GrCF 2 W2 E2-Termoelectrica: Chisinau District Heating
