logo

Blind Creek Solar Farm and Battery project

Sector: Solar • Location: Bungendore, Australia

Source: Asian Power

Project
Under Construction

The Blind Creek project in Bungendore combines 300 MW of solar power with a 243 MW/486 MWh battery system. It uses an agri-solar model allowing sheep grazing while producing enough electricity to power more than 120,000 homes, reducing emissions equivalent to taking 200,000 cars off the road annually. The DC-coupled hybrid design maximizes efficiency and grid support during high-demand periods. Co

Status
Under Construction
Sector
Solar, Raw Materials, Automotive, Power Generation (CCGT), Road, Energy Storage
Location
Bungendore, Australia
Updated
22 Jul 2026
Source
Asian Power

ConstructChat

Ask ConstructChat about Blind Creek Solar Farm and Battery project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Blind Creek Solar Farm and Battery project” is an infrastructure initiative in the Solar sector, located in Bungendore, Australia. Taiyo aggregates data on it from Asian Power.

Participants

Not available for this record.

Status

Original status

under construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Blind Creek project in Bungendore combines 300 MW of solar power with a 243 MW/486 MWh battery system. It uses an agri-solar model allowing sheep grazing while producing enough electricity to power more than 120,000 homes, reducing emissions equivalent to taking 200,000 cars off the road annually. The DC-coupled hybrid design maximizes efficiency and grid support during high-demand periods. Construction is underway, creating up to 300 jobs at peak, with ongoing employment once operational.

Original sector

Energy

Budget

Location

Country

Australia

City

Bungendore

Source

Source

Asian Power

URL

More Details

Record type

Project

Sector

Solar, Raw Materials, Automotive, Power Generation (CCGT), Road, Energy Storage

Article published date

2026-03-19

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project