BLM Roseburg Storage Pole Buildings MATOC
Sector: Commercial • Location: Roseburg, Oregon, United States of America
Source: Dodge USA
. The project will involve the furnishing and construction of one 48' X 96' pre-engineered pole building, and one 36'x84' pre-engineered pole building. Work includes all structural design, manufacture, and/or fabrication, storage, transportation and erection of all members, concrete footings and slab, aggregate surfacing around buildings, disposal of excavated materials, asphalt concrete surfacing
- Status
- Under Construction
- Sector
- Commercial, Warehouse, Cement, Manufacturing (Industrial), Power Transmission, Road, Consumer Products, Metal, Raw Materials, Power Generation (CCGT)
- Location
- Roseburg, Oregon, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about BLM Roseburg Storage Pole Buildings MATOC
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | GC Bidding |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | . The project will involve the furnishing and construction of one 48' X 96' pre-engineered pole building, and one 36'x84' pre-engineered pole building. Work includes all structural design, manufacture, and/or fabrication, storage, transportation and erection of all members, concrete footings and slab, aggregate surfacing around buildings, disposal of excavated materials, asphalt concrete surfacing and sealing, and incidental construction. - Required Trades: Utility Locator, Surveyor, SWPPP, M... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Oregon |
City | Roseburg |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Warehouse, Cement, Manufacturing (Industrial), Power Transmission, Road, Consumer Products, Metal, Raw Materials, Power Generation (CCGT) |
Article published date | 2024-06-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in United States of America
- SR 3/US 19 FROM 0.14 MI S OF SR 7 TO HENRY COUNTY LINE
- SR 150 FROM 0.18 MI S OF CR 14/STERLING WELLS ROAD TO SR 47
- SR 61 FM PAULDING COUNTY LINE TO N OF CR 522/OLD ALABAMA RD
- COMMERCIAL DRIVE IN STATHAM
- SR 21 FROM 0.02 MI S OF SR 30 TO 0.24 MI S OF NS 916917C
- SR 155 FROM JONESBORO ROAD TO DEKALB COUNTY LINE
- SR 400 @ CR 9284/WINDWARD PKWY
- SR 49 FROM BIBB COUNTY LINE TO BALDWIN COUNTY LINE
