logo
ProjectClosed

Block#22 New Fire Hall Construction

The status, timeline and source of this project. A free account opens every field.

Source: Dodge

Project consists of a one-story, 124 x 84, 10,416 SF pre-engineered metal building located at 115 6th Street West, Bottineau, ND 58318. Demolition and utilities by owner. Site conditions are assumed to be suitable soil for construction. Construction of a new Fire Hall to replace the existing Fire Hall currently attached to the City Armory, located within the city limits of Bottineau, on Block 22 o

Status
Closed
Sector
Commercial, Power Transmission, Road, Power Generation (CCGT), Metal, Manufacturing (Industrial), Government
Location
Bottineau, North Dakota, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Block 22 New Fire Hall Construction

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Block 22 New Fire Hall Construction” is an infrastructure initiative in the Commercial sector, located in Bottineau, North Dakota, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Project consists of a one-story, 124 x 84, 10,416 SF pre-engineered metal building located at 115 6th Street West, Bottineau, ND 58318. Demolition and utilities by owner. Site conditions are assumed to be suitable soil for construction. Construction of a new Fire Hall to replace the existing Fire Hall currently attached to the City Armory, located within the city limits of Bottineau, on Block 22 of the Original Townsite.to provide Construction Management at Risk (CMAR) services to participate...

Procurement method

Budget

Location

Country

United States of America (USA)

State

North Dakota

City

Bottineau

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Commercial, Power Transmission, Road, Power Generation (CCGT), Metal, Manufacturing (Industrial), Government

Article published date

2025-01-13

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project