logo

Bloor Yonge Capacity Improvement Project

Sector: Water Supply and Storage • Location: Ontario, Canada

Source: Infrastructure Canada

Project
In Progress

The project includes the rehabilitation and expansion of the Bloor-Yonge Subway Station in Toronto, Ontario. Once complete, the project will enable reliable, safe and comfortable levels of service by addressing existing capacity and accessibility constraints at the station, and will also future-proof the station to meet transit demand that will serve regional growth and development in the coming d

Status
Under Construction
Sector
Water Supply and Storage, Mass Transit, Tunnel, Power Transmission, Waste Processing and Treatment, Road, Power Generation (CCGT)
Location
Ontario, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about Bloor Yonge Capacity Improvement Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Bloor Yonge Capacity Improvement Project” is an infrastructure initiative in the Water Supply and Storage sector, located in Ontario, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Not available for this record.

Status

Original status

in progress

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project includes the rehabilitation and expansion of the Bloor-Yonge Subway Station in Toronto, Ontario. Once complete, the project will enable reliable, safe and comfortable levels of service by addressing existing capacity and accessibility constraints at the station, and will also future-proof the station to meet transit demand that will serve regional growth and development in the coming decades. The work will involve: • Construction of a second platform on the existing Line 2 eastbound platform; • Renovations to convert the existing center platform on Line 2 to westbound only use; • Expansion of the Line 1 northbound and southbound platforms; • 4 New Subway Ventilation System (SVS) fan plants; • Renovation of 1 existing SVS fan plant; • Construction of a new electrical substation; • New vertical circulation elements: elevators, escalators and stairs; • Reconfiguration of the main station entrance and fare line; • Construction of a new, secondary accessible entrance on Bloor Street; • Sewer works and the demolition of existing buildings surrounding the station, • fare collection, track and signals, artwork, communication, signage and wayfinding, and other site works; and • utility works. The project will result in improved capacity of public transit infrastructure, improved quality and/or safety of existing or future transit systems, and improved access to the public transit system in Toronto, Ontario.

Original sector

Public Transit

Location

Country

Canada

State

Ontario

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Mass Transit, Tunnel, Power Transmission, Waste Processing and Treatment, Road, Power Generation (CCGT)

Article published date

2026-04-05

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project