Blossom Solar Project
Construction documents · Ohio · Last reported Mar 2025
Source: Dodge
144-megawatt, photovoltaic electric generation facility - The Project will also consist of the fenceline, inverters, a substation (The Substation will be constructed with concrete foundations and aggregate surface cover that is expected to be no more than 90,000 square feet, e.g., 300 feet by 350 feet, in size.) , below ground electrical collection lines, access roads, a data control structure, an
- Status
- Closed
- Sector
- Road, Power Generation (CCGT), Solar, Cement, Commercial
- Location
- Iberia, Ohio, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Blossom Solar Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Construction Documents |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | 144-megawatt, photovoltaic electric generation facility - The Project will also consist of the fenceline, inverters, a substation (The Substation will be constructed with concrete foundations and aggregate surface cover that is expected to be no more than 90,000 square feet, e.g., 300 feet by 350 feet, in size.) , below ground electrical collection lines, access roads, a data control structure, and pyranometers. This project will deliver to a single point of interconnection (POI) to the Galio... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Ohio |
City | Iberia |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Road, Power Generation (CCGT), Solar, Cement, Commercial |
Article published date | 2025-03-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in United States of America
- KING STREET IN COHUTTA
- SR 120/ROSWELL RD@CR 4662/EAST COBB DR EXT LT TURN LANE
- DISTRICTWIDE PAVEMENT MARKING DIST 7
- EPHESUS CHURCH ROAD BR.& APPR.@ DOG RIVR(097-02278-00105E)
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 109 FROM ALABAMA STATE LINE TO SR 14/US 29
- JASPER-DAHLONEGA ROAD
- MOULTRIE - SYLVESTER ROAD
