Blossom Solar Project
Construction documents · Ohio · Last reported Oct 2024
Source: Dodge USA
144-megawatt, photovoltaic electric generation facility - The Project will also consist of the fenceline, inverters, a substation (The Substation will be constructed with concrete foundations and aggregate surface cover that is expected to be no more than 90,000 square feet, e.g., 300 feet by 350 feet, in size.) , below ground electrical collection lines, access roads, a data control structure, an
- Status
- Closed
- Sector
- Power Generation (CCGT), Commercial, Road, Solar, Cement
- Location
- Iberia, Ohio, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Blossom Solar Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Construction Documents |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | 144-megawatt, photovoltaic electric generation facility - The Project will also consist of the fenceline, inverters, a substation (The Substation will be constructed with concrete foundations and aggregate surface cover that is expected to be no more than 90,000 square feet, e.g., 300 feet by 350 feet, in size.) , below ground electrical collection lines, access roads, a data control structure, and pyranometers. This project will deliver to a single point of interconnection (POI) to the Galio... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Ohio |
City | Iberia |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Commercial, Road, Solar, Cement |
Article published date | 2024-10-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 77 @ FALLING CREEK 6.1 MI S OF ELBERTON
- VALDOSTA - AIRFIELD ELECTRICAL IMPROVEMENTS
- CR 423/MOUNT OLIVE ROAD @ SANDY CREEK NW OF DUBLIN
- DISTWIDE STUDY REMOVAL/RELOCATION OF UTILITY POLES DIST 3
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization