Blount County Transition Campus Phase I
Sector: Manufacturing (Industrial) • Location: Maryville, Tennessee, United States of America
Source: Dodge USA
Building 1 Substance Use Residential Treatment Facility (SURTF), a 7,142-sf facility (8) bed sleeping room with bathrooms. Common areas include offices, nurse station, classrooms, living room, dining room, kitchen, beak room, staff toilet, laundry, medical office, therapy rooms and utility/storage rooms. Building 2 Residential Re-Entry Housing Program (RRHP) a 6,708-sf facility, (2) single bed sle
- Status
- Closed
- Sector
- Manufacturing (Industrial), Power Transmission, Commercial, Hospital, Power Generation (CCGT), Hotel, Residential
- Location
- Maryville, Tennessee, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Blount County Transition Campus Phase I
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Building 1 Substance Use Residential Treatment Facility (SURTF), a 7,142-sf facility (8) bed sleeping room with bathrooms. Common areas include offices, nurse station, classrooms, living room, dining room, kitchen, beak room, staff toilet, laundry, medical office, therapy rooms and utility/storage rooms. Building 2 Residential Re-Entry Housing Program (RRHP) a 6,708-sf facility, (2) single bed sleeping rooms, (8) two bed sleeping rooms and (4) bathrooms with showers. Common areas include offi... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Tennessee |
City | Maryville |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Power Transmission, Commercial, Hospital, Power Generation (CCGT), Hotel, Residential |
Article published date | 2024-10-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- SR 75 FROM SR 2 TO NORTH CAROLINA STATE LINE
- SR 20 FM PRESTON HILLS/LAUREL DR TO CR 715/REYNOLDS RD
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 10 FROM CR 107/NORTH LEG DRIVE TO CR 2485/HALE STREET
- CS 493/INDUSTRIAL BLVD FROM SR 19 TO SR 31 - TIA
- SR 19;SR 23; SR 26 & SR 204 @ 9 LOCS - BRIDGE PRESERVATION
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- West lake sammamish parkway phase 2
