Blue Ash Central System Phase 2
Sector: Broadband • Location: Cincinnati, Ohio, United States of America
Source: Dodge USA
Installation of approximately 24,220 LF of armored 96 fiber optic interconnect cable along portions of Reed Hartman Highway and connecting roads; Hunt Road, Cooper Road, Glendale Milford Road, and Creek Road. Fiber optic equipment will be installed in traffic signal controller cabinets. The remaining Reed Hartman Hwy closed loop system will be converted to a centrally controlled Centracs system. T
- Status
- Closed
- Sector
- Broadband, Road, Telecommunications, Government, Commercial, Manufacturing (Industrial)
- Location
- Cincinnati, Ohio, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Blue Ash Central System Phase 2
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Installation of approximately 24,220 LF of armored 96 fiber optic interconnect cable along portions of Reed Hartman Highway and connecting roads; Hunt Road, Cooper Road, Glendale Milford Road, and Creek Road. Fiber optic equipment will be installed in traffic signal controller cabinets. The remaining Reed Hartman Hwy closed loop system will be converted to a centrally controlled Centracs system. The installation of six (6) CCTV camera systems including upgrading the City s Genetec security ce... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Ohio |
City | Cincinnati |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Broadband, Road, Telecommunications, Government, Commercial, Manufacturing (Industrial) |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Broadband projects in United States of America
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- UPGRADE (E) WIRELESS TELECOMMUNICATIONS FACILITY.ADD 2 ANTENNAS ADD 3 RRU'S ADD 1 OVP SURGE PROTECTOR ADD 1 HYBRID
- INSTALLATION OF A NEW SMALL CELL WIRELESS FACILITY IN THE PUBLIC RIGHT OF WAY
- REMOVE AND REPLACE NEW WIRELESS ANTENNAS AND RELATED EQUIPMENT
- DISH WIRELESS COLLOCATION ONTO EXISTING WIRELESS FACILITY AND GROUND BASE STATION
- MODIFY EXISTING WIRELESS FACILITY, REMOVE (2) TMA'S, INSTALL (1) RRU , REMOVE (2) DIPLEXERS & UTILITY STANDS, REMOVE (2)
- TEMPORARY USE FOR TEMPORARY FACILITY - CELL SITE ON WHEELS (COW) FOR VERIZON WIRELESS - 67-FEET TALL
- DISH WIRELESS WILL BE PERFORMING A 1ST TIME INSTALL AT AN EX ISTING COMM FACILITY. ADDING 3 ANTENNA AND 6 RRU TO TOP OF T
