Blue Earth County Ditch No .79 REBID
Sector: Commercial • Location: Judson Township, Minnesota, United States of America
Source: Dodge USA
The project includes the following major quantities of Work: 1. Approximately 10,105 linear feet of agricultural tile with sizes ranging from 8-inch to -24inch. An estimated total of 100 linear feet of directional drilling or boring 24-inch pipe under roadway for 510th Ave crossing. Four open cut and restore gravel road for 513th Ave and 219th Street road crossings. Approximately 0.05 acres heavy
- Status
- Closed
- Sector
- Commercial, Consumer Products, Raw Materials, Road, Government, Manufacturing (Industrial)
- Location
- Judson Township, Minnesota, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Blue Earth County Ditch No .79 REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project includes the following major quantities of Work: 1. Approximately 10,105 linear feet of agricultural tile with sizes ranging from 8-inch to -24inch. An estimated total of 100 linear feet of directional drilling or boring 24-inch pipe under roadway for 510th Ave crossing. Four open cut and restore gravel road for 513th Ave and 219th Street road crossings. Approximately 0.05 acres heavy vegetative clearing and construction of new mainline tile outlet. Site restoration of disturbed t... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Minnesota |
City | Judson Township |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Consumer Products, Raw Materials, Road, Government, Manufacturing (Industrial) |
Article published date | 2024-04-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in United States of America
- SR 3/US 19 FROM 0.14 MI S OF SR 7 TO HENRY COUNTY LINE
- SR 150 FROM 0.18 MI S OF CR 14/STERLING WELLS ROAD TO SR 47
- SR 61 FM PAULDING COUNTY LINE TO N OF CR 522/OLD ALABAMA RD
- COMMERCIAL DRIVE IN STATHAM
- SR 21 FROM 0.02 MI S OF SR 30 TO 0.24 MI S OF NS 916917C
- SR 155 FROM JONESBORO ROAD TO DEKALB COUNTY LINE
- SR 400 @ CR 9284/WINDWARD PKWY
- SR 49 FROM BIBB COUNTY LINE TO BALDWIN COUNTY LINE
