BLUE NILE PUMP
One of 677 projects Taiyo tracks in Sudan.
Source: World Bank Group
The Blue Nile Pump Schemes Rehabilitation Project will, over a five year period, facilitate the rehabilitation of the Shasheina Region and provide agricultural machinery and workshops for cotton cultivation in the rest of the BNAC area. The project, situated on both sides of the Blue Nile river from about 30 kms upstream of Singa to Sennar, will cover 52,500 feddans and about 50,000 feddans respec
- Status
- Closed
- Sector
- Road, Water Supply and Storage, Fertilizers, Automotive, Waste Processing and Treatment, Consumer Products, Raw Materials, Government
- Location
- Sudan
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about BLUE NILE PUMP
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Blue Nile Pump Schemes Rehabilitation Project will, over a five year period, facilitate the rehabilitation of the Shasheina Region and provide agricultural machinery and workshops for cotton cultivation in the rest of the BNAC area. The project, situated on both sides of the Blue Nile river from about 30 kms upstream of Singa to Sennar, will cover 52,500 feddans and about 50,000 feddans respectively inside and outside the Shasheina Region. The project will improve levels of productivity, particularly for cotton (in both regions), sorghum, groundnuts and vegetables, and introduce fodder crop for livestock (in Shasheina only). As a result, cotton exports will be increased, incomes for the BNAC and the tenants will rise and the schemes will once again be placed on a sound management and financial footing. This will be achieved through provision of: (i) agricultural machinery, equipment and spare parts; (ii) new pumphouses and improved irrigation distribution systems; (iii) buildings for administration, workshops and staff housing; (iv) operating vehicles and a telecommunications network; (v) service roads and potable water supply; and (vi) technical assistance and consultancy services for strengthening management for project implementation and operation. |
Original sector | Agriculture, Fishing and Forestry |
Location
Country | Sudan |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Road, Water Supply and Storage, Fertilizers, Automotive, Waste Processing and Treatment, Consumer Products, Raw Materials, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in Sudan
- White Nile Sugar Factory
- Cross-border collaboration Western Ethiopia - East Sudan
- TAH6: Ndjamena to Djibouti - Missing Road Links in Sudan
- Juba-Bor-Malakal-Renki-Sudan border Railway
- Juba-Bor-Malakal-Renki-Sudan border Road
- Renk (South Sudan/Sudan) OSBP
- Sudan - Agricultural Value Chain Development Project (AVCDP)
- Port Sudan Saukin Tokar Road Study
