logo
ProjectClosed

BLUE NILE PUMP

One of 677 projects Taiyo tracks in Sudan.

Source: World Bank Group

The Blue Nile Pump Schemes Rehabilitation Project will, over a five year period, facilitate the rehabilitation of the Shasheina Region and provide agricultural machinery and workshops for cotton cultivation in the rest of the BNAC area. The project, situated on both sides of the Blue Nile river from about 30 kms upstream of Singa to Sennar, will cover 52,500 feddans and about 50,000 feddans respec

Status
Closed
Sector
Road, Water Supply and Storage, Fertilizers, Automotive, Waste Processing and Treatment, Consumer Products, Raw Materials, Government
Location
Sudan
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about BLUE NILE PUMP

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “BLUE NILE PUMP” is an infrastructure initiative in the Road sector, located in Sudan. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Blue Nile Pump Schemes Rehabilitation Project will, over a five year period, facilitate the rehabilitation of the Shasheina Region and provide agricultural machinery and workshops for cotton cultivation in the rest of the BNAC area. The project, situated on both sides of the Blue Nile river from about 30 kms upstream of Singa to Sennar, will cover 52,500 feddans and about 50,000 feddans respectively inside and outside the Shasheina Region. The project will improve levels of productivity, particularly for cotton (in both regions), sorghum, groundnuts and vegetables, and introduce fodder crop for livestock (in Shasheina only). As a result, cotton exports will be increased, incomes for the BNAC and the tenants will rise and the schemes will once again be placed on a sound management and financial footing. This will be achieved through provision of: (i) agricultural machinery, equipment and spare parts; (ii) new pumphouses and improved irrigation distribution systems; (iii) buildings for administration, workshops and staff housing; (iv) operating vehicles and a telecommunications network; (v) service roads and potable water supply; and (vi) technical assistance and consultancy services for strengthening management for project implementation and operation.

Original sector

Agriculture, Fishing and Forestry

Location

Country

Sudan

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Road, Water Supply and Storage, Fertilizers, Automotive, Waste Processing and Treatment, Consumer Products, Raw Materials, Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project