logo

Blue Stream Gas Pipeline Sea Section Project

Sector: Natural Gas • Location: Russian Federation, Turkey

Source: World Bank Group

Project
Active

In February 1999, the Russian-Italian Blue Stream pipeline B.V. Company, a joint venture between Gazprom and ENI, entered into a memorandum of understanding with the Government of Russia and Turkey to develop the Blue Stream Gas Pipeline Project on a build-own-operate (BOO) basis. The Blue Stream Gas Pipeline project provided the Russian natural gas directly to Turkey going under the Black Sea. In

Project Information FAQ

Project Information

4 Q
The project “Blue Stream Gas Pipeline Sea Section Project” is an infrastructure initiative in the Natural Gas sector, located in Russian Federation, Turkey. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

In February 1999, the Russian-Italian Blue Stream pipeline B.V. Company, a joint venture between Gazprom and ENI, entered into a memorandum of understanding with the Government of Russia and Turkey to develop the Blue Stream Gas Pipeline Project on a build-own-operate (BOO) basis. The Blue Stream Gas Pipeline project provided the Russian natural gas directly to Turkey going under the Black Sea. In October 2002, the construction of the Blue Stream Gas Pipeline, connecting offshores of Turkish and Russian Black Sea, was completed. The Blue Stream Pipeline B.V. Company was a joint venture between Gazprom of Russia and ENI of Italy where each owned a 50% stake. Under the agreement, this joint venture acted as the owner of a sea section of the gas pipeline. The land section of the gas pipeline was owned and operated by Gazprom. The Blue stream pipeline was 1213km long, and consisted of three sections: 1. Russia’s land section was 373km-long going from the town of Izobilnoye, Stavropol area, up to the settlement of Arkhipo-Osipovka, Krasnodar area, and to the Black Sea coast. 2. Marine section was 396-km-long going from the settlement of Arkhipo-Osipovka of the Krasnodar area (Russia) up to the Durusu terminal located 60 kilometers off the town of Samsun (Turkey) 3. Turkey’s land section was 444-kilometers-long going from the town of Samsun to Ankara. The total construction cost of the project was estimated at US$1.7 billion for the sea section, and the project reached financial closure in May 2001. http://www.gazprom.com/eng/

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data