Bluenose Academy
One of 10,000+ projects Taiyo tracks in Canada.
Source: Bird Construction
The school incorporates characteristics of the traditional architecture of the former Bluenose Academy built circa 1906. The construction of the Bluenose Academy was challenged by the requirement to obtain LEED Gold certification. The sustainable building includes solar panels and walls to generate heat for hot water, electricity and air systems. Satisfying the 100% fresh air turnover requirement,
- Status
- Unknown
- Sector
- Commercial, Metal, Nuclear, Power Generation (CCGT), Solar, Water Supply and Storage, Road, Government
- Location
- Canada
- Updated
- 22 Jul 2026
- Source
- Bird Construction
ConstructChat
Ask ConstructChat about Bluenose Academy
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | unknown |
Taiyo status | Unknown |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The school incorporates characteristics of the traditional architecture of the former Bluenose Academy built circa 1906. The construction of the Bluenose Academy was challenged by the requirement to obtain LEED Gold certification. The sustainable building includes solar panels and walls to generate heat for hot water, electricity and air systems. Satisfying the 100% fresh air turnover requirement, perforated metal collector panels were installed on the south facing wall allowing solar radiation to heat the air behind the panels. Ventilation fans then draw in the heated air, which is distributed by the HVAC system. Without compromising the schedule, the Bird team was able to deliver all the LEED requirements to the client on time by employing a commissioning manager onsite to oversee the installation of all solar energy technologies used. |
Location
Country | Canada |
Source
Source reliability | High |
Source | Bird Construction |
URL |
More Details
Record type | Project |
Sector | Commercial, Metal, Nuclear, Power Generation (CCGT), Solar, Water Supply and Storage, Road, Government |
Article published date | 2023-11-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in Canada
- Site C Worker Accommodation
- Transport and Rescue Squadron Hangar Facility - 19 Wing CFB Comox 442
- Thornwood Residences Phase 2
- Canadian Tire Corporate Office Interior Renovation
- St. Stephen Border Crossing
- Aqsarniit Hotel and Convention Centre
- Safeway Refrigerated Warehouse
- International Brotherhood of Boilermakers Training Centre and Union Hall
