logo

Blueprint Data Centers Data Center Project

Sector: Power Generation (CCGT) • Location: Taylor, Texas, United States

Source: Taylor Press

Project
Planned

Blueprint Data Centers plans to build a data center at 1601 E. MLK Jr. Blvd in Taylor, Texas. The project aims to support the growth of technology initiatives like Samsung Austin Semiconductor. The data center will initially use 30 megawatts of power, with plans to increase to 60 megawatts, supported by a new electric substation being built by Oncor. The project has faced opposition from local res

Status
Prospective
Sector
Power Generation (CCGT), Data Center, Advanced Electronics, Residential
Location
Taylor, Texas, United States of America
Updated
22 Jul 2026
Source
Taylor Press

ConstructChat

Ask ConstructChat about Blueprint Data Centers Data Center Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Blueprint Data Centers Data Center Project” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Taylor, Texas, United States. Taiyo aggregates data on it from Taylor Press.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Blueprint Data Centers plans to build a data center at 1601 E. MLK Jr. Blvd in Taylor, Texas. The project aims to support the growth of technology initiatives like Samsung Austin Semiconductor. The data center will initially use 30 megawatts of power, with plans to increase to 60 megawatts, supported by a new electric substation being built by Oncor. The project has faced opposition from local residents concerned about health risks, environmental impact, and proximity to residential areas. An independent environmental study was conducted and provided to the city, though not publicly shared with neighbors.

Original sector

Built Sector

Budget

Location

Country

United States of America (USA)

State

Texas

City

Taylor

Source

Source

Taylor Press

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Data Center, Advanced Electronics, Residential

Article published date

2025-09-16

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project