Blueprint Data Centers Data Center Project
Sector: Power Generation (CCGT) • Location: Taylor, Texas, United States
Source: Taylor Press
Blueprint Data Centers plans to build a data center at 1601 E. MLK Jr. Blvd in Taylor, Texas. The project aims to support the growth of technology initiatives like Samsung Austin Semiconductor. The data center will initially use 30 megawatts of power, with plans to increase to 60 megawatts, supported by a new electric substation being built by Oncor. The project has faced opposition from local res
- Status
- Prospective
- Sector
- Power Generation (CCGT), Data Center, Advanced Electronics, Residential
- Location
- Taylor, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Taylor Press
ConstructChat
Ask ConstructChat about Blueprint Data Centers Data Center Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Blueprint Data Centers plans to build a data center at 1601 E. MLK Jr. Blvd in Taylor, Texas. The project aims to support the growth of technology initiatives like Samsung Austin Semiconductor. The data center will initially use 30 megawatts of power, with plans to increase to 60 megawatts, supported by a new electric substation being built by Oncor. The project has faced opposition from local residents concerned about health risks, environmental impact, and proximity to residential areas. An independent environmental study was conducted and provided to the city, though not publicly shared with neighbors. |
Original sector | Built Sector |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Taylor |
Source
Source | Taylor Press |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Data Center, Advanced Electronics, Residential |
Article published date | 2025-09-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States
- EPC of Turbine and Foundation Structure in the Southwest Sea Wind Power Demonstration Complex
- Engineering, Procurement, and Construction of Third Bosphorus Bridge
- Tampa Bay Seawater Desalination Plant
- Carlsbad Desalination Project, San Diego, California
- Joint Base Lewis-McChord
- Fort Benning, Georgia
- Naval Base San Diego, California
- Dover Air Force Base
