logo

Bluestem Solar Phase 1 275MW

Sector: Energy Storage • Location: Rolling Prairie, Indiana, United States of America

Source: Dodge USA

Project
Design Development

Two phase ground-mounted solar and battery energy storage system (BESS) facility on 2,400 acres using bifacial silicon-based solar panels. Phase One includes 275 MW solar, Phase Two will add 125 MW solar and 100 MW BESS, for a total of 400 MW solar and 100 MW Bess, enough energy to power approximately 68,000 homes. To be located in the northeastern area of LaPorte County, Indiana, in Wills, Kankak

Status
Prospective
Sector
Energy Storage, Power Generation (CCGT), Solar, Seaport, Residential, Commercial
Location
Rolling Prairie, Indiana, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Bluestem Solar Phase 1 275MW

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Bluestem Solar Phase 1 275MW” is an infrastructure initiative in the Energy Storage sector, located in Rolling Prairie, Indiana, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Design Development

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Two phase ground-mounted solar and battery energy storage system (BESS) facility on 2,400 acres using bifacial silicon-based solar panels. Phase One includes 275 MW solar, Phase Two will add 125 MW solar and 100 MW BESS, for a total of 400 MW solar and 100 MW Bess, enough energy to power approximately 68,000 homes. To be located in the northeastern area of LaPorte County, Indiana, in Wills, Kankakee, and Pleasant Townships.

Budget

Location

Country

United States of America (USA)

State

Indiana

City

Rolling Prairie

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Energy Storage, Power Generation (CCGT), Solar, Seaport, Residential, Commercial

Article published date

2024-10-08

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project