Bluestem Solar Phase 2 100MW/100MW BESS
Planning schematics · Indiana · Last reported Oct 2024
Source: Dodge USA
Two phase ground-mounted solar and battery energy storage system (BESS) facility on 2,400 acres using bifacial silicon-based solar panels. Phase One includes 275 MW solar, Phase Two will add 125 MW solar and 100 MW BESS, for a total of 400 MW solar and 100 MW Bess, enough energy to power approximately 68,000 homes. To be located in the northeastern area of LaPorte County, Indiana, in Wills, Kankak
- Status
- Prospective
- Sector
- Energy Storage, Power Generation (CCGT), Solar, Seaport, Residential, Commercial
- Location
- Kankakee Township, Indiana, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Bluestem Solar Phase 2 100MW/100MW BESS
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Two phase ground-mounted solar and battery energy storage system (BESS) facility on 2,400 acres using bifacial silicon-based solar panels. Phase One includes 275 MW solar, Phase Two will add 125 MW solar and 100 MW BESS, for a total of 400 MW solar and 100 MW Bess, enough energy to power approximately 68,000 homes. To be located in the northeastern area of LaPorte County, Indiana, in Wills, Kankakee, and Pleasant Townships. |
Budget |
Location
Country | United States of America (USA) |
State | Indiana |
City | Kankakee Township |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Energy Storage, Power Generation (CCGT), Solar, Seaport, Residential, Commercial |
Article published date | 2024-10-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Energy Storage projects in United States of America
- INSTALL ROOF MOUNTED SOLAR PV SYSTEM 14 KW 35 MODULES AND 1 BATTERY 13.5 KWH ESS
- INSTALL (141) TESLA SOLAR ROOF TILES AT 10.152 KW TOTAL. INS TALL (13.5) KWH ENERGY STORAGE SYSTEM AND (N) LOAD CENTER
- 10' SUSPENDED WIRE PERIMETER SECRURITY SYSTEM INSIDE FENCE, BATTERY OPERATED LOW VOLTAGE
- INSTALL ROOF MOUNTED SOLAR PV SYSTEM 4.32 KW 12 MODULES AND INSTALL BACK-UP BATTERY 10.5 KWH, EQUIP. ON ENGINEERED FENCE
- INSTALL ROOF MOUNTED SOLAR PV SYSTEM 4.2 KW 12 MODULES 1 LG CHEM BATTERY 9.5 KWH
- REMOVE & REPLACE ANTENNAS, RRUS, BATTERY UNIT
- INSTALL ROOF MOUNTED SOLAR PV SYSTEM 10.8 KW 27 PANELS 1 NEW TESLA BATTERY NEW 100 AMP SOLAR PANEL
- PHASE 3-DATA CENTER- ENCOMPASSING OF PART OF 3RD FLOOR AHU ELECTRICAL ROOM,BATTERY ROOM,INSALL GENERATORS&EQUIP IN YARD
