BlueWave Solar Agrivoltaic Project
Sector: Road • Location: Northfield, Massachusetts, United States
Source: Greenfield Recorder
The project involves the proposed construction of a 2.29-megawatt agrivoltaic solar array on a 16.1-acre parcel of land on Pine Meadow Road. The Northfield Planning Board denied the special permit for this project due to concerns over flooding, property values, and alignment with the town's rural character.
- Status
- Failure
- Sector
- Road, Solar
- Location
- Northfield, Massachusetts, United States of America
- Updated
- 22 Jul 2026
- Source
- Greenfield Recorder
ConstructChat
Ask ConstructChat about BlueWave Solar Agrivoltaic Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Denied |
Taiyo status | Failure |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project involves the proposed construction of a 2.29-megawatt agrivoltaic solar array on a 16.1-acre parcel of land on Pine Meadow Road. The Northfield Planning Board denied the special permit for this project due to concerns over flooding, property values, and alignment with the town's rural character. |
Original sector | Energy |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Northfield |
Source
Source | Greenfield Recorder |
URL |
More Details
Record type | Project |
Sector | Road, Solar |
Article published date | 2025-03-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
