logo
ProjectPlanned

Bluewood Skyline Express Lift Replacement

Sector: Hotel • Location: Dayton, Washington, United States

Source: SnowBrains

Bluewood is replacing its main base to summit lift with a used bubble high-speed quad lift from Europe, modernizing its lift fleet.

Status
Prospective
Sector
Hotel
Location
Dayton, Washington, United States of America
Updated
19 Nov 2026
Source
SnowBrains

ConstructChat

Ask ConstructChat about Bluewood Skyline Express Lift Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Bluewood Skyline Express Lift Replacement” is an infrastructure initiative in the Hotel sector, located in Dayton, Washington, United States. Taiyo aggregates data on it from SnowBrains.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

Bluewood is replacing its main base to summit lift with a used bubble high-speed quad lift from Europe, modernizing its lift fleet.

Original sector

Built Sector

Location

Country

United States of America (USA)

State

Washington

City

Dayton

Source

Source

SnowBrains

URL

More Details

Record type

Project

Sector

Hotel

Article published date

2025-09-16

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project