Blyth Battery Project
The owner, status and timeline of this project. A free account opens every field.
Source: Asian Power
Neoen has commenced the operation of its Blyth Battery project in South Australia, which has a capacity of 238.5 megawatts (MW) / 477 megawatt-hours (MWh). This project is the highest capacity battery project in South Australia and will contribute to the grid while supporting renewable energy contracts.
- Status
- Closed
- Sector
- Power Generation (CCGT), Energy Storage
- Location
- South Australia, Australia
- Updated
- 22 Jul 2026
- Source
- Asian Power
ConstructChat
Ask ConstructChat about Blyth Battery Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Company |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Neoen has commenced the operation of its Blyth Battery project in South Australia, which has a capacity of 238.5 megawatts (MW) / 477 megawatt-hours (MWh). This project is the highest capacity battery project in South Australia and will contribute to the grid while supporting renewable energy contracts. |
Original sector | Energy |
Location
Country | Australia |
State | South Australia |
Source
Source | Asian Power |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Energy Storage |
Article published date | 2025-04-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
