logo
ProjectCompleted

BMR Wind

The status, timeline and source of this project. A free account opens every field.

Source: International Finance Corporation (IFC)

IFC is considering a $20 million loan to BMR Jamaica Wind Limited to support the development of a 34 MW greenfield wind farm in St Elizabeth Parish, Jamaica. The project site is in Malvern, on a ridge immediately adjacent to JPS’ existing 3 MW Munroe wind farm, which has four operating 750 kW turbines. The project will consist of eleven 3.3 MW Vestas 112 wind turbines (tower height: 86 m, blade di

Status
Closed
Sector
Raw Materials, Seaport, Power Generation (CCGT), Wind, Fertilizers, Road, Government
Location
Jamaica
Updated
22 Jul 2026
Source
International Finance Corporation (IFC)

ConstructChat

Ask ConstructChat about BMR Wind

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “BMR Wind” is an infrastructure initiative in the Raw Materials sector, located in Jamaica. Taiyo aggregates data on it from International Finance Corporation (IFC).

Participants

Sponsoring Agency

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

IFC is considering a $20 million loan to BMR Jamaica Wind Limited to support the development of a 34 MW greenfield wind farm in St Elizabeth Parish, Jamaica. The project site is in Malvern, on a ridge immediately adjacent to JPS’ existing 3 MW Munroe wind farm, which has four operating 750 kW turbines. The project will consist of eleven 3.3 MW Vestas 112 wind turbines (tower height: 86 m, blade diameter: 112m), a substation, an interconnection upgrade at Jamaica Public Services’ (JPS) existing Spur Tree substation, construction of a new approximately 18 km, 69 kV transmission line, and site access roads. There will also be a temporary laydown area established for storage of materials and parts during construction. No workers accommodation camp is required; non-local construction workers and managers will be lodged in local accommodation establishments. BMR aims to start construction in the fourth quarter of 2014 and commence operations in mid-2015. The Engineering, Procurement and Construction (EPC) contractor will be Vestas, the turbine supplier, and Vestas will also have a long-term service contract with BMR covering operations and maintenance. The wind turbines and blades will be brought to Jamaica by ship and transported to site by road by an experienced local transport provider. A transport survey has been completed on the proposed route to enable any necessary upgrades to be made and a dry-run undertaken.The wind farm will be located on a ~35 ha site owned by Jamaica’s National Land Agency (NLA), of which around 35 ha will be leased directly from NLA(Note: JPS is surrendering these leased parcels and BMR is then leasing the same from NLA). JPS began leasing this portion from NLA as a temporary laydown area during construction of Munroe wind farm. No relocation is required to establish the wind farm; six crop/vegetable growers and one livestock owner will be affected by the development, all of whom use a combined total of 9 ha of land owned by NLA. These farmers have been consulted with via NLA and have agreed to halt cropping activities from summer 2014 until the project is constructed. There is no formal Jamaican requirement for BMR to compensate these land users for disrupted access to their NLA-owned croplands during construction and partial permanent land acquisition for project operations. Nevertheless, BMR will be compensating them in kind for construction-phase livelihood disruption and will sub-lease alternative land for them (from JPS’s adjacent wind farm) in lieu of productive lands permanently acquired by the project for turbine pads.The planned 69 kV transmission line will be approximately 18 km long and require placement of 155 treated wooden poles sufficient to carry a single conductor. It will be constructed over a 9-10 month period and owned by JPS, the company primarily responsible for power generation, transmission and distribution in Jamaica. The line will have a 22 m wide right of way (RoW) where clearing is required and an 11 m wide RoW along roadways and areas that require minimal clearing. BMR has undertaken an iterative route selection exercise in order to minimize the number of privately held parcels impacted, as well as to minimize the need for bush clearing. This process resulted in a transmission line that requires 38 less pole locations than originally planned, 6.9 ha of land clearing (a 70% reduction) and involves 20 individual landowners (over 80 fewer than initially identified). The vast majority of the route will fall onto lands owned by ALPART, a large alumina mining and processing company, or NLA. Construction of the line will require no relocation of households and minimal, if any, economic displacement. BMR will lease land from ALPART, NLA and the 20 private landholders on a willing-lessor, willing-lessee basis, entering into easement agreements with each of the landholders. These agreements are based on independent land valuation studies commissioned by BMR conducted prior to 1-on-1 negotiations. No dedicated access road is required to construct and maintain the transmission line; instead, access points will be established along the course of the route.The nearest existing windfarm to the site, excluding the very small Munroe facility, is the 38.7 MW Wigton wind farm which was constructed in 2004 and expanded in 2010. This site is located 17 km away from the BMR site; given the size of the two facilities and this degree of geographic separation, no significant cumulative impacts are foreseen.

Original sector

V-BC - Wind Power - Renewable Energy Generation

Location

Country

Jamaica

Source

Source

International Finance Corporation (IFC)

URL

More Details

Record type

Project

Sector

Raw Materials, Seaport, Power Generation (CCGT), Wind, Fertilizers, Road, Government

Article published date

2026-01-18

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project