logo

BMS-Inverter Hybrid Project

Sector: Energy Storage • Location: Australia

Source: Australian Renewable Energy Agency (ARENA)

Project
Closed

The BMS-Inverter Hybrid Project combines two central components in battery storage systems – the battery management system and the inverter – into a single solution, leading to lower system costs and increased lifespan.Key resultsThe key findings from this project are as follows:Relectrify has successfully demonstrated both single-and three-phase prototype BMS+Inverter systems using second-life Ni

Project Information FAQ

Project Information

5 Q
The project “BMS-Inverter Hybrid Project” is an infrastructure initiative in the Energy Storage sector, located in Australia. Taiyo aggregates data on it from Australian Renewable Energy Agency (ARENA).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The BMS-Inverter Hybrid Project combines two central components in battery storage systems – the battery management system and the inverter – into a single solution, leading to lower system costs and increased lifespan.Key resultsThe key findings from this project are as follows:Relectrify has successfully demonstrated both single-and three-phase prototype BMS+Inverter systems using second-life Nissan Leaf battery modules, in solutions rated up to 60kWh / 20kW.Preliminary testing demonstrated a round-cycle combined second-life battery and inverter efficiency in line with market-leading new battery products.Harmonics testing achieved power quality levels suitable for grid compliance.Relectrify has received notable customer interest in the BMS+Inverter and has secured follow-on demonstration projects on multiple continents.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data