BNA Terminal Area Roadway Improvements Phase 3.1
Sector: Water Supply and Storage • Location: Nashville, Tennessee, United States of America
Source: Dodge
This project consists of the third phase of the Terminal Area Roadway Improvements (TARI) at Nashville International Airport (BNA). This phase will encompass the demolition of old Donelson Pike between the Airport Connector Roadway and I-40, reconfiguration of Lot B including a new revenue control plaza, construction of a segment of new Terminal Drive and the new Terminal Drive bridge over Fly Nas
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Airport, Power Transmission, Commercial, Power Generation (CCGT), Waste Processing and Treatment, Bridge
- Location
- Nashville, Tennessee, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about BNA Terminal Area Roadway Improvements Phase 3.1
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project consists of the third phase of the Terminal Area Roadway Improvements (TARI) at Nashville International Airport (BNA). This phase will encompass the demolition of old Donelson Pike between the Airport Connector Roadway and I-40, reconfiguration of Lot B including a new revenue control plaza, construction of a segment of new Terminal Drive and the new Terminal Drive bridge over Fly Nashville Way, partial construction of Fly Nashville Way, and construction of Ramp V. Work items inc... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Tennessee |
City | Nashville |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Airport, Power Transmission, Commercial, Power Generation (CCGT), Waste Processing and Treatment, Bridge |
Article published date | 2025-03-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
