BNSF Bridge Replacement in California
One of 10,000+ projects Taiyo tracks in California.
Source: Railway Track and Structures
BNSF has completed the replacement of a 350-foot-long, double-track concrete beam bridge with new steel beams and track panels on its Southern Transcon in Fenner, California. The project was executed in two phases, allowing for continuous train operations on one track during the work.
- Status
- Closed
- Sector
- Rail, Mass Transit, Cement, Steel, Metal, Bridge, Warehouse
- Location
- Fenner, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Railway Track and Structures
ConstructChat
Ask ConstructChat about BNSF Bridge Replacement in California
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | BNSF has completed the replacement of a 350-foot-long, double-track concrete beam bridge with new steel beams and track panels on its Southern Transcon in Fenner, California. The project was executed in two phases, allowing for continuous train operations on one track during the work. |
Original sector | Transportation |
Location
Country | United States of America (USA) |
State | California |
City | Fenner |
Source
Source | Railway Track and Structures |
URL |
More Details
Record type | Project |
Sector | Rail, Mass Transit, Cement, Steel, Metal, Bridge, Warehouse |
Article published date | 2025-03-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
