logo
ProjectActive

BNU

Active · Pakistan

Source: International Finance Corporation (IFC)

The 586 MW Uch Power Station (“Uch-I”), owned and operated by Uch Power (Private) Limited (“UPL”), an IFC client, has been in operation since 2000. In March 2007, the Government of Pakistan (“GOP”) through the Private Power and Infrastructure Board (“PPIB”) requested UPL to submit a bid for a capacity expansion to the existing plant. The expansion was designed to utilize the supply of indigenous g

Status
Prospective
Sector
Waste Processing and Treatment, Water Supply and Storage, Wind, Geothermal, Government, Power Generation (CCGT), Oil and Gas
Location
Pakistan
Updated
19 Nov 2026
Source
International Finance Corporation (IFC)

ConstructChat

Ask ConstructChat about BNU

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “BNU” is an infrastructure initiative in the Waste Processing and Treatment sector, located in Pakistan. Taiyo aggregates data on it from International Finance Corporation (IFC).

Participants

Sponsoring Agency

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

The 586 MW Uch Power Station (“Uch-I”), owned and operated by Uch Power (Private) Limited (“UPL”), an IFC client, has been in operation since 2000. In March 2007, the Government of Pakistan (“GOP”) through the Private Power and Infrastructure Board (“PPIB”) requested UPL to submit a bid for a capacity expansion to the existing plant. The expansion was designed to utilize the supply of indigenous gas in the Uch Gas Field (“UGF”) and to increase the supply of low cost power to the country. UPL proposed a 404 MW combined cycle expansion project (“Uch II” or the “Project”) on a Build-Own-Operate (“BOO”) basis. All energy that would be produced by the Project would be sold to the National Transmission and Dispatch Company (“NTDC”) under a 25-year Power Purchase Agreement, backed by a GOP Guarantee. An Implementation Agreement would be signed prior to financial close that would entail the GOP’s support for the project and would also lay out the rights and obligations of all parties. The proposed expansion will be structure as a standalone Independent Power Plant (“IPP”) and will be built on the site of the first plant, utilizing the available vacant land, and will use some of the existing physical and management infrastructure. The project will use the indigenous gas that is available in the UGF and is being used by the first plant. In addition to the infrastructure, the project will benefit from synergies with the existing plant in the form of a shared management team as well as common utilization of O&M resources and administrative staff. The synergies are expected to result in a shorter construction period as well as reduced overall project costs which would result in a more competitive tariff for the project. Similar to the operating 586 MW Uch-I plant, the Project is expected to be one of the lowest cost producers of power in the country and would be in line with IFC’s strategy to support the development of low cost thermal power and help improve sector operating costs.

Original sector

AB - Gas - Thermal Power Generation

Location

Country

Pakistan

Source

Source

International Finance Corporation (IFC)

URL

More Details

Record type

Project

Sector

Waste Processing and Treatment, Water Supply and Storage, Wind, Geothermal, Government, Power Generation (CCGT), Oil and Gas

Article published date

2025-08-08

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project