logo

BO EL NINO EMERGENCY

Sector: Road • Location: Bolivia

Source: World Bank Group

Project
Closed

The objectives of the El Nino Emergency Assistance Project for Bolivia are to help reduce the loss of human life and a deterioration of living standards that may result from the floods and/or droughts caused by the 1997-98 El Nino event; 2) to assist in reducing the expected loss of, or damage to, economic and social infrastructure and disruption of economic activity; 3) to assist in the rehabilit

Status
Closed
Sector
Road, Water Supply and Storage, Power Generation (CCGT), Waste Processing and Treatment, Raw Materials, Government, Commercial
Location
Bolivia
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about BO EL NINO EMERGENCY

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “BO EL NINO EMERGENCY” is an infrastructure initiative in the Road sector, located in Bolivia. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The objectives of the El Nino Emergency Assistance Project for Bolivia are to help reduce the loss of human life and a deterioration of living standards that may result from the floods and/or droughts caused by the 1997-98 El Nino event; 2) to assist in reducing the expected loss of, or damage to, economic and social infrastructure and disruption of economic activity; 3) to assist in the rehabilitation and reconstruction of damaged infrastructure facilities; and 4) to help restore agricultural productive capacity for the next growing season in areas possibly affected by drought. There are five components. The first consists of flood prevention works, drought mitigation works, and essential equipment such as bailey bridges, temporary power plants, and other equipment needed for managing an emergency response. The second flexibly allocates resources to 1) rehabilitate and rebuild flood-damaged public infrastructure facilities; and 2) regenerate productive capacity in the drought areas by drilling wells, rebuilding small irrigation systems, building earthen dams, and procuring and distributing seeds. The third component provides technical assistance to strengthen the technical operations unit, for sub-project identification and implementation, and for a medium term monitoring and prevention strategy. The fourth and fifth components consist of a project preparation advance and unallocated funding.

Original sector

FY17 - Agriculture, Fishing and Forestry,FY17 - Public Administration,FY17 - Transportation,FY17 - Water, Sanitation and Waste Management,Transportation

Budget

Location

Country

Bolivia

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Road, Water Supply and Storage, Power Generation (CCGT), Waste Processing and Treatment, Raw Materials, Government, Commercial

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project