Boardwalk Power Link
Sector: Telecommunications • Location: New Brunswick, New Jersey, United States of America
Source: Dodge
HVDC line connecting offshore wind energy produced off the coast of New Jersey and coming onshore in Monmouth County. The energy will travel via buried HVDC cable, via a route that lies 90% in the public right-of-way, to a state of the art converter station to be built directly adjacent to the Deans 500KV Substation located in South Brunswick, New Jersey.
- Status
- Prospective
- Sector
- Telecommunications, Wind, Road, Power Transmission, Power Generation (CCGT), Commercial
- Location
- New Brunswick, New Jersey, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Boardwalk Power Link
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | HVDC line connecting offshore wind energy produced off the coast of New Jersey and coming onshore in Monmouth County. The energy will travel via buried HVDC cable, via a route that lies 90% in the public right-of-way, to a state of the art converter station to be built directly adjacent to the Deans 500KV Substation located in South Brunswick, New Jersey. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New Jersey |
City | New Brunswick |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Telecommunications, Wind, Road, Power Transmission, Power Generation (CCGT), Commercial |
Article published date | 2025-02-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Telecommunications projects in United States of America
- ATLANTA STREETCAR EAST EXTENSION FROM JACKSON ST TO IRWIN ST
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- UPGRADE (E) WIRELESS TELECOMMUNICATIONS FACILITY.ADD 2 ANTENNAS ADD 3 RRU'S ADD 1 OVP SURGE PROTECTOR ADD 1 HYBRID
- INSTALLATION OF A NEW SMALL CELL WIRELESS FACILITY IN THE PUBLIC RIGHT OF WAY
- REMOVE AND REPLACE NEW WIRELESS ANTENNAS AND RELATED EQUIPMENT
- INSTALL 1 FLAGPOLE,6 ANTENNAS,1 RADOME,3 POWER CABLES,3 HYBR D CABLES,JUMPERS FROM RRUS TO ANTENNAS,NEW 10'X10'LEASE..SEE
- DISH WIRELESS COLLOCATION ONTO EXISTING WIRELESS FACILITY AND GROUND BASE STATION
- COLLOCATION OF (3)NEW ANTENNAS & ASSOCIATED CABLES & EQUIPMT PER ATTACHED SCOPE OF WORK. 6904 COMPLIANT AT&T (E)CELL SITE
