Boardwalk Replacement Phase 1
Sector: Manufacturing (Industrial) • Location: Wildwood, New Jersey, United States of America
Source: Dodge
Work under this contract shall include furnishing all labor, equipment and materials required to completely demolish the existing boardwalk and to construct a new timber boardwalk inclusive of access ramps and stairs between 16th and 18th Avenues in the City of North Wildwood as shown and as detailed in the contract documents. Project Description The Bid includes complete demolition of the existin
- Status
- Prospective
- Sector
- Manufacturing (Industrial), Cement, Government, Forest Products and Packaging, Commercial
- Location
- Wildwood, New Jersey, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Boardwalk Replacement Phase 1
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Work under this contract shall include furnishing all labor, equipment and materials required to completely demolish the existing boardwalk and to construct a new timber boardwalk inclusive of access ramps and stairs between 16th and 18th Avenues in the City of North Wildwood as shown and as detailed in the contract documents. Project Description The Bid includes complete demolition of the existing reinforced concrete and timber boardwalk structure and access ramps and stairs and construction... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New Jersey |
City | Wildwood |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Cement, Government, Forest Products and Packaging, Commercial |
Article published date | 2025-07-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- SR 75 FROM SR 2 TO NORTH CAROLINA STATE LINE
- SR 20 FM PRESTON HILLS/LAUREL DR TO CR 715/REYNOLDS RD
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 10 FROM CR 107/NORTH LEG DRIVE TO CR 2485/HALE STREET
- CS 493/INDUSTRIAL BLVD FROM SR 19 TO SR 31 - TIA
- SR 19;SR 23; SR 26 & SR 204 @ 9 LOCS - BRIDGE PRESERVATION
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- West lake sammamish parkway phase 2
