Boars Head Road Sidewalk
Sector: Water Supply and Storage • Location: New Brunswick, Canada
Source: Infrastructure Canada
This project is mainly for the construction of a new connector sidewalk on Boars Head Road, Saint John, New Brunswick. This section of sidewalk is 340m in length and 1.5m in width located between 399 and 515 Boars Head Road. The project will create a pedestrian connection to the Millidgeville Centre Suburban Residential Intensification Area, and will create a pedestrian connection to a Primary Cor
- Status
- Prospective
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Residential, Car parking, Road, Government, Automotive
- Location
- New Brunswick, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Boars Head Road Sidewalk
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | pre-construction |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project is mainly for the construction of a new connector sidewalk on Boars Head Road, Saint John, New Brunswick. This section of sidewalk is 340m in length and 1.5m in width located between 399 and 515 Boars Head Road. The project will create a pedestrian connection to the Millidgeville Centre Suburban Residential Intensification Area, and will create a pedestrian connection to a Primary Corridor (important transportation routes that connect Intensification Areas and key destinations). The project scope of work also includes installing curb on the other side of Boars Head road between civic addresses 382 and 510. The total length of new curb is about 720m. The following is a breakdown of the scope of work: 1- Installing curb and side walk on one side of the street between 399 and 515 Boars Head Road 2- Installing curb on one side of Boars Head road between civic addresses 382 and 510 3- Extending the storm sewer network on Boars Head Road and connecting to existing network. This includes the installation of about 150m of pipes, 3 manholes and 6 catch basins. 4-Resurfacing the road with new asphalt ( approximately 700 tonnes) 5-Traffic line painting the resurfaced section of street 6-Landscaping repair work |
Original sector | Active Transportation |
Budget |
Location
Country | Canada |
State | New Brunswick |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Residential, Car parking, Road, Government, Automotive |
Article published date | 2025-06-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
