logo

Boars Head Road Sidewalk

Sector: Water Supply and Storage • Location: New Brunswick, Canada

Source: Infrastructure Canada

Project
Completed

This project is mainly for the construction of a new connector sidewalk on Boars Head Road, Saint John, New Brunswick. This section of sidewalk is 340m in length and 1.5m in width located between 399 and 515 Boars Head Road. The project will create a pedestrian connection to the Millidgeville Centre Suburban Residential Intensification Area, and will create a pedestrian connection to a Primary Cor

Project Information FAQ

Project Information

4 Q
The project “Boars Head Road Sidewalk” is an infrastructure initiative in the Water Supply and Storage sector, located in New Brunswick, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

This project is mainly for the construction of a new connector sidewalk on Boars Head Road, Saint John, New Brunswick. This section of sidewalk is 340m in length and 1.5m in width located between 399 and 515 Boars Head Road. The project will create a pedestrian connection to the Millidgeville Centre Suburban Residential Intensification Area, and will create a pedestrian connection to a Primary Corridor (important transportation routes that connect Intensification Areas and key destinations). The project scope of work also includes installing curb on the other side of Boars Head road between civic addresses 382 and 510. The total length of new curb is about 720m. The following is a breakdown of the scope of work: 1- Installing curb and side walk on one side of the street between 399 and 515 Boars Head Road 2- Installing curb on one side of Boars Head road between civic addresses 382 and 510 3- Extending the storm sewer network on Boars Head Road and connecting to existing network. This includes the installation of about 150m of pipes, 3 manholes and 6 catch basins. 4-Resurfacing the road with new asphalt ( approximately 700 tonnes) 5-Traffic line painting the resurfaced section of street 6-Landscaping repair work

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data