Boars Head Road Sidewalk
Sector: Water Supply and Storage • Location: New Brunswick, Canada
Source: Infrastructure Canada
This project is mainly for the construction of a new connector sidewalk on Boars Head Road, Saint John, New Brunswick. This section of sidewalk is 340m in length and 1.5m in width located between 399 and 515 Boars Head Road. The project will create a pedestrian connection to the Millidgeville Centre Suburban Residential Intensification Area, and will create a pedestrian connection to a Primary Cor
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | completed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | This project is mainly for the construction of a new connector sidewalk on Boars Head Road, Saint John, New Brunswick. This section of sidewalk is 340m in length and 1.5m in width located between 399 and 515 Boars Head Road. The project will create a pedestrian connection to the Millidgeville Centre Suburban Residential Intensification Area, and will create a pedestrian connection to a Primary Corridor (important transportation routes that connect Intensification Areas and key destinations). The project scope of work also includes installing curb on the other side of Boars Head road between civic addresses 382 and 510. The total length of new curb is about 720m. The following is a breakdown of the scope of work: 1- Installing curb and side walk on one side of the street between 399 and 515 Boars Head Road 2- Installing curb on one side of Boars Head road between civic addresses 382 and 510 3- Extending the storm sewer network on Boars Head Road and connecting to existing network. This includes the installation of about 150m of pipes, 3 manholes and 6 catch basins. 4-Resurfacing the road with new asphalt ( approximately 700 tonnes) 5-Traffic line painting the resurfaced section of street 6-Landscaping repair work |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
