Boating Infrastructure Grant Program - Tier 1, Basic
Sector: Wind • Location: United States of America
Source: Grants.gov
Recreational boating is a popular activity; there are approximately 13 million registered boats in the U.S. Of this total, an estimated 600,000 are at least 26 feet long and are considered nontrailerable. BIG provides Federal funds to States to construct, renovate, and maintain boating infrastructure facilities for transient, nontrailerable recreational vessels 26 feet in length or longer. Project
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | archived |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Recreational boating is a popular activity; there are approximately 13 million registered boats in the U.S. Of this total, an estimated 600,000 are at least 26 feet long and are considered nontrailerable. BIG provides Federal funds to States to construct, renovate, and maintain boating infrastructure facilities for transient, nontrailerable recreational vessels 26 feet in length or longer. Projects completed using BIG funds must provide public access, but may be publicly or privately owned. Some examples of potentially eligible activities include (See Section IV (E), Funding Restrictions for additional information): (a) Mooring buoys (permanently anchored floats designed to tie up eligible recreational vessels); (b) Day-docks (tie-up facilities that do not allow overnight use); (c) Navigational aids (e.g., channel markers, buoys, and directional information); (d) Transient slips (slips that boaters with eligible recreational vessels occupy for no more than 10 consecutive days); FY 2012 BIG Tier 1 RFA 3 (e) Safe harbors (facilities protected from waves, wind, tides, ice, currents, etc., that provide a temporary safe anchorage point or harbor of refuge during storms); (f) Floating docks and fixed piers; (g) Floating and fixed breakwaters; (h) Dinghy docks (floating or fixed platforms that boaters with nontrailerable recreational vessels use for a temporary tie-up of their small boats to reach the shore); (i) Restrooms and showers; (j) Retaining walls; (k) Bulkheads; (l) Dockside utilities; (m) Pumpout stations; (n) Recycling and trash receptacles; (o) Dockside electric service; (p) Dockside water supplies; (q) Dockside pay telephones; (r) Debris deflection booms; (s) Marine fueling stations; and (t) One time dredging, not to exceed 10% of total BIG project costs, including match. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
