logo

Bobov Dol Power Plant

Sector: Geothermal • Location: Bulgaria

Source: World Bank Group

Project
Active

In January 2009, local company Energia MK [Bulgaria] completed its payment to the Bulgarian Privatization Agency (PA) for 100% of the state-owned Bobov Dol Power Plant, a 630MW lignite-fired thermal power plant in southwestern Bulgaria. The plant comprised three 210MW generating units.

The plant was sold by way of a competitive bidding process. On March 13, 2008, the PA launched the tender fo

Project Information FAQ

Project Information

4 Q
The project “Bobov Dol Power Plant” is an infrastructure initiative in the Geothermal sector, located in Bulgaria. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

In January 2009, local company Energia MK [Bulgaria] completed its payment to the Bulgarian Privatization Agency (PA) for 100% of the state-owned Bobov Dol Power Plant, a 630MW lignite-fired thermal power plant in southwestern Bulgaria. The plant comprised three 210MW generating units. The plant was sold by way of a competitive bidding process. On March 13, 2008, the PA launched the tender for 100% (251,400 shares) of the Bobov Dol Power Plant, setting a minimum bid price of BGN100 million (US$74.6 million). Five companies purchased documentation to take part in the tender: Energia MK [Bulgaria]; Minna Kompaniya [Bulgaria]; Damco Energy [Greece]; SENCAP, a joint venture of state-owned power utility PPRC [Greece], investment fund Contour Global [United States] and the EBRD; and Electrabel [Belgium]. However, in April 2008, only two companies prequalified to take part in the final bidding: Energia MK [Bulgaria] and Minna Kompaniya [Bulgaria]. The deadline for final bids was June 26, 2008. Minna Kompaniya was disqualified from the final auction because it reportedly failed to make the required deposit payment. Energia MK was selected as the winner of the auction, bidding BGN100 million (US$74.6 million). In September 2008, the PA signed the privatization contract with Energia MK. The contract stipulated a purchase price of BGN100 million (US$74.6 million) and an investment obligation on the part of Energia MK of EUR 35 million (US$51.5 million). In addition, the buyer was to keep Bobov Dol’s payroll unchanged for three years and buy 1.85 million tonnes of coal yearly from the adjacent coal mines. The buyer must also bring the plant in line with European Union environmental standards before operating the plant at full capacity (630MW). At the time of the divestiture, the plant was operating at 420MW. Energy MK CEO was sentenced to prison for tax evasion. Follow up for 2012 update with the status.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data