logo

Boca Tigris Bridge

Sector: Road • Location: China

Source: World Bank Group

Project
Active

In June 1994, Hopewell Humen Development Limited, a wholly-owned subsidiary of Hopewell Holdings, signed a cooperative joint-venture contract with the Dongguan and Panyu municipalities The bridge is a 4.6-km dual three-lane suspension bridge linking major cities on each side of the Pearl River and is connected to the GSZ-East Superhighway (also a Hopewell project). The joint venture also involves

Project Information FAQ

Project Information

4 Q
The project “Boca Tigris Bridge” is an infrastructure initiative in the Road sector, located in China. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

In June 1994, Hopewell Humen Development Limited, a wholly-owned subsidiary of Hopewell Holdings, signed a cooperative joint-venture contract with the Dongguan and Panyu municipalities The bridge is a 4.6-km dual three-lane suspension bridge linking major cities on each side of the Pearl River and is connected to the GSZ-East Superhighway (also a Hopewell project). The joint venture also involves construction of 11.16 km of approach roads in Guangdong Province for the construction and operation of the Boca Tigris Bridge. Hopewell Holdings has a 10% equity share in the joint venture, and a 6.7% profit share. Hopewell contributed Rmb 27.39 million (US$ 3.2 million) in equity, and Rmb 246.51 million (US$ 28.3 million) as a shareholder loan. The total project costs were Rmb 3,593 million (US$ 413 million). The joint venture period is for construction plus thirty years. The bridge opened for trial operations in May 1997. Toll rates require approval from the Guangdong Provincial Price Bureau, and in 1997 ranged from Rmb 5 to Rmb 180 depending on the type of vehicle. None None

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data