Bockenden Cutting
Sector: Tunnel • Location: Kenilworth, Warwickshire, United Kingdom
Source: Ground Engineering
HS2 Ltd has submitted a planning application for a 530m long cutting that will connect to the south end of the Burton Green tunnel. This cutting will carry the High Speed 2 (HS2) rail track and serve as a noise screen for nearby residential areas.
- Status
- Prospective
- Sector
- Tunnel, Rail, Residential
- Location
- Kenilworth, Warwickshire, United Kingdom
- Updated
- 22 Jul 2026
- Source
- Ground Engineering
ConstructChat
Ask ConstructChat about Bockenden Cutting
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Company |
Status
Original status | Planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | HS2 Ltd has submitted a planning application for a 530m long cutting that will connect to the south end of the Burton Green tunnel. This cutting will carry the High Speed 2 (HS2) rail track and serve as a noise screen for nearby residential areas. |
Original sector | Transportation |
Location
Country | United Kingdom (UK) |
State | Warwickshire |
City | Kenilworth |
Source
Source | Ground Engineering |
URL |
More Details
Record type | Project |
Sector | Tunnel, Rail, Residential |
Article published date | 2025-02-13 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
