Bodyline VSRS Building | Structural Foundations
Sector: Automotive • Location: CA, United States of America (USA)
Source: Anvil Builders
General improvements and additional construction is ongoing at an electric automobile manufacturing facility in Fremont, California, where its renowned electric vehicles are assembled. In the spring of 2017, designs were completed for three new buildings that together would serve as an integrated facility on the factory’s south side. This included the Vertical Storage Retrieval System building, th
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Obfuscated Data |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | General improvements and additional construction is ongoing at an electric automobile manufacturing facility in Fremont, California, where its renowned electric vehicles are assembled. In the spring of 2017, designs were completed for three new buildings that together would serve as an integrated facility on the factory’s south side. This included the Vertical Storage Retrieval System building, the Receiving building and the Case Storage building. The combined footprint for these new buildings was in excess of 46,000 square feet. Anvil Builders contracted directly with the electric automobile manufacturing facility for construction of the structural foundations on these three buildings, along with five loading docks and ramps, and miscellaneous parking lot/courtyard paving. The total structural concrete placed approached nearly 4,000 cubic yards, with 3,000 yards needing to be placed in a continuous pour over the course of a single 12-hour shift overnight. Careful coordination with other trades was critical during these pours, in order that anchor bolts for structural steel members, embedments for walls and loading docks were properly situated. Planning and coordination both prior to and during these large continuous pours was the principle hurdle faced during construction, but Anvil also overcame a number of other complications. Additional work added to the contract with no time added to the contract required that several work activities be scheduled for nighttime shifts and on weekends. And with the bulk of the work taking place in summertime, Anvil had to carefully assess its work environment to ensure the safety of its workers, when daytime highs would often reach 110˚F or higher. Other misc. work included SD catch basins and trench drains to collect water from building rain water leaders. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Automotive projects in United States of America (USA)
- US 77 Victoria
- FM 1960 Access Management Study from East Gatewick to BF 1960A
- FM 1179 (E Villa Maria Road and Briarcrest Drive) Raised Medians
- Texas Electric Vehicle Infrastructure Plan
- SH 249 Harris County - BW 8 to I-45 North
- FM 2818 (Harvey Mitchell Parkway) widening
- US 82 (West of Clarksville), US 82 (East of Clarksville) and US 82 Clarksville Loop Projects
- US 59 - El Campo