Boehringer Ingelheim Research Institute of Molecular Pathology (IMP)
Sector: Bridge • Location: Austria
Source: Pharmaceutical Technology
The construction of a research facility for the Research Institute of Molecular Pathology (IMP) at the Vienna Biocentre in the third district of Vienna, Austria, fully sponsored by Boehringer Ingelheim, began in March 2015. Research centre Vienna, Austria March 2015 March 2017 €50m ($54.53m) ATP architects engineers PORR Boehringer Ingelheim The construction of a research facility for the Research
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The construction of a research facility for the Research Institute of Molecular Pathology (IMP) at the Vienna Biocentre in the third district of Vienna, Austria, fully sponsored by Boehringer Ingelheim, began in March 2015. Research centre Vienna, Austria March 2015 March 2017 €50m ($54.53m) ATP architects engineers PORR Boehringer Ingelheim The construction of a research facility for the Research Institute of Molecular Pathology (IMP) at the Vienna Biocentre in the third district of Vienna, Austria, fully sponsored by Boehringer Ingelheim, began in March 2015. German pharmaceutical company Boehringer Ingelheim invested €50m ($54.53m) in the facility’s construction. The building, opened in March 2017, is one of the world’s leading molecular biology research institutes. The IMP building has a 15,000ft² total floor space, a 14,945m² gross built area and a 66,854m³ gross built volume. It accommodates 250 researchers from 35 countries and will include sophisticated laboratories and office space. The building includes a five-storey atrium, under which the office and laboratory areas are arranged. It houses a spacious lecture hall, server room, workshop and cafeteria. A smooth glass facade stretches up the atrium from the ground floor to the fourth floor. The facade is transparent in the open areas. A bridge connects the facade to the neighbouring building so that the entire infrastructure is used. The facility opens up possibilities to further develop the Vienna Biocentre in future. It is intended to bring about improvements in infrastructure, flexibility and new communication opportunities to achieve scientific results. The facility is used to carry out research in cell and molecular biology, neurobiology, disease mechanisms and computational biology. It is used for the discovery of fundamental molecular and cellular mechanisms underlying complex biological phenomena. Research at the facility focuses on neural circuits in drosophila auditory perception and memory in the neocortex, spatio-temporal specificity of microRNA (miRNA) function, and stem cell commitment in the haematopoiesis circuit mechanics of emotions in the limbic system. Research topics include symmetry breaking during cell polarisation, learning and memory in drosophila, in addition to the molecular basis of migration, molecular machines, and mechanisms of protein quality control and antibody diversification. Other areas of research focus include systems biology of regulatory motifs and networks, molecular mechanisms of kinetochore function, mitosis and chromosome biology, and finding and probing cancer drug targets using advanced in-vivo RNA interference (RNAi). The contract to design the IMP building was awarded to Austria-based company ATP architects engineers. The building construction contract was awarded to PORR, another Austrian company. Constructed using building information modelling (BIM), the IMP building complies with environmentally friendly methods. It has a resource-saving energy concept to allow most of the energy used in the building to be recycled. Get industry leading news, data and analysis delivered to your inbox Give your business an edge with our leading industry insights. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
